New B07 stock units, currently being delivered for the Woolwich Arsenal extension, the Stratford International extension and the platform lengthening programme.
New B07 stock, awaiting entry into service at Beckton depot. Visible in this shot are from left to right) 108, 106+105, 109 and 112,
23/08/2008 • 003454
New unit 106, in the company of other B07 units at Beckton
23/08/2008 • 003459
112 seen in the depot at Beckton
23/08/2008 • 003460
105 before entry into passenger service, at Beckton depot
23/08/2008 • 003461
107 at Beckton depot. Behind is 110
23/08/2008 • 003462
112 at Beckton depot
23/08/2008 • 003463
105 at Beckton depot
23/08/2008 • 003464
105 and 93 stabled at Poplar depot, making a nice comparison between new B07 stock and older DLR train design
10/01/2009 • 003494
07 pulling into Poplar on a Woolwich Arsenal train
10/01/2009 • 003495
106, just arrived at Woolwich Arsenal from Bank
10/01/2009 • 003513
Inside B07 unit 106
10/01/2009 • 003514
Inside B07 unit 106
10/01/2009 • 003515
104 at Woolwich Arsenal
10/01/2009 • 003516
104 at London City Airport
10/01/2009 • 003517
104 on the first day of the Woolwich Arsenal service, at King George V
10/01/2009 • 003518
109 at King George V on a Woolwich service
10/01/2009 • 003520
110 at the rear of Woolwich train
10/01/2009 • 003522